Customization: | Available |
---|---|
After-sales Service: | Online Support/Video Technical Support/Spare Parts |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 15000/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. The machine employs hydraulically-driven swing beam, the steel plate welded structure, and accumulator -based pullback cylinder with steady and reliable operation.
2.Indicator-based adjustment of gap of blade is convenient and fast.
3. The machine is equipped with lighting alignment device, and uses stepless control for the stroke of up tool carrier.
4.The machine uses protection fence for safe operation.
5.Digital display device for size of back gauge and shearing times available.
Hydraulic Swing Beam Shearing Machine
|
6X2500
|
6X3200
|
6X4000
|
6X6000
|
Cutting Thickness (mm)
|
6
|
6
|
6
|
6
|
Cutting Width (mm)
|
2500
|
3200
|
4000
|
6000
|
Throat Depth (mm)
|
100
|
100
|
100
|
100
|
Cutting Angle (o)
|
1.5
|
1.5
|
1.5
|
1.5
|
Backgauge Range (mm)
|
20-600
|
20-600
|
20-600
|
20-800
|
Stroke Number (times/min)
|
≥12
|
≥11
|
≥9
|
≥5
|
Main Motor (kw)
|
7.5
|
7.5
|
7.5
|
7.5
|
Weight (kg)
|
4800
|
6000
|
8200
|
16500
|
Overall Dimensions (LxWxH in mm) |
3150X1700X1650 | 3850X1700X1650 | 4650X1850X1700 | 6780X2100X2300 |
Equipment Installation and Debugging:
1. The supplier shall provide the purchaser with technical services such as the basic diagram of the equipment, schematic diagrams of water, electricity, gas and installation requirements within 10 days after signing the contract.
2. After the equipment is assembled in the supplier's factory, promptly notify the purchaser to send personnel to the supplier's site for pre-acceptance; and promptly notify the purchaser to make preparations for the installation and commissioning of the equipment at the purchaser's site.
3. The supplier provides free installation and commissioning services of the machine, and the buyer provides the necessary auxiliary facilities such as machine hoisting equipment and scaffolding and several auxiliary workers.
4. After the equipment is installed and debugged at the buyer's site, the final acceptance of the equipment is carried out.
Personnel training:
1. The supplier assigns professional and technical personnel to provide technical training for the buyer's operators free of charge.
2. The first stage: During the installation and commissioning period, at the user site, combined with the commissioning, use and programming of the equipment, the operators, maintenance personnel and technicians will be trained for 2 days, so that the relevant personnel of the user's operation have the ability to use the equipment proficiently. ability.
3. The second stage: After three months of normal operation of the equipment, if the demander needs it, the supplier can improve the training of maintenance personnel, operators and technicians again, so that the relevant personnel have the ability to troubleshoot and maintain the equipment, and improve their performance. Operating and programming skills.
Equipment warranty period and after-sales service: